High-Rise Marriott Hotel Near Topping Out In Chelsea episode artwork

EPISODE · Oct 8, 2020 · 4 MIN

High-Rise Marriott Hotel Near Topping Out In Chelsea

from Elevator World · host Elevator World

Welcome to the Elevator World News Podcast. Today’s podcast news podcast is sponsored by elevatorbooks.com: www.elevatorbooks.com HIGH-RISE MARRIOTT HOTEL NEAR TOPPING OUT IN CHELSEA Construction on a Marriott hotel in NYC's Chelsea neighborhood is nearing topping out, New York YIMBY reported on October 6. The 39-story tower at 113 West 24th Street, designed by Stonehill & Taylor Architects and developed by Lam Generation, will stand 420 ft tall with 360 rooms. The building's reinforced concrete superstructure is only a few floors below the parapet, and much of the glass curtain wall has been installed. With a total 136,700 ft2, the tower will have 10 guest rooms per level from the fourth to the 41st floor and feature a rooftop bar. A finalized rendering has not been released, and a completion date has not been announced. Image credit: by Michael Young for New York YIMBY To read the full transcript of today's podcast, visit: elevatorworld.com/news Subscribe to the Podcast: iTunes │ Google Play | SoundCloud │ Stitcher │ TuneIn

Episode metadata supplied by the publisher feed · Published Oct 8, 2020

Embed this episode

NOW PLAYING

High-Rise Marriott Hotel Near Topping Out In Chelsea

0:00 4:46

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Elevator World?

This episode is 4 minutes long.

When was this Elevator World episode published?

This episode was published on October 8, 2020.

Can I download this Elevator World episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!