EPISODE · Jul 6, 2026 · 1 MIN
Highway 93 Resurfacing Alert | Bozeman News
from Bozeman News Today | 2 Min News | The Daily News Now!
Drivers on U.S. Highway 93 north or south of Ravalli brace for major roadwork— crews will resurface a 6.7-mile stretch between White Coyote Road and Holt Street from July 9 to 15, with weekday work hours from 7 a.m. to 7 p.m. Expect single-lane delays, pilot cars, and up to an hour of slowdowns as crews tackle ruts, apply micro-surface, and repaint pavement markings to deliver a smoother, longer-lasting ride. Stay updated via MDT 511. Project managed by Montana DOT and Riverside Contracting. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/8c9418882a613a57
NOW PLAYING
Highway 93 Resurfacing Alert | Bozeman News
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.