Highway 93 Resurfacing Alert | Bozeman News episode artwork

EPISODE · Jul 6, 2026 · 1 MIN

Highway 93 Resurfacing Alert | Bozeman News

from Bozeman News Today | 2 Min News | The Daily News Now!

Drivers on U.S. Highway 93 north or south of Ravalli brace for major roadwork— crews will resurface a 6.7-mile stretch between White Coyote Road and Holt Street from July 9 to 15, with weekday work hours from 7 a.m. to 7 p.m. Expect single-lane delays, pilot cars, and up to an hour of slowdowns as crews tackle ruts, apply micro-surface, and repaint pavement markings to deliver a smoother, longer-lasting ride. Stay updated via MDT 511. Project managed by Montana DOT and Riverside Contracting. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/8c9418882a613a57

Episode metadata supplied by the publisher feed · Published Jul 6, 2026

Embed this episode

NOW PLAYING

Highway 93 Resurfacing Alert | Bozeman News

0:00 1:13

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Bozeman News Today | 2 Min News | The Daily News Now!?

This episode is 1 minute long.

When was this Bozeman News Today | 2 Min News | The Daily News Now! episode published?

This episode was published on July 6, 2026.

Can I download this Bozeman News Today | 2 Min News | The Daily News Now! episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!