Hive Earnings and CFO Interview, NVIDIA Backstops $500B OpenAI Site, Blue Energy’s 2.5 GW Gas/Nuke Build for Crusoe episode artwork

EPISODE · Aug 17, 2026 · 1H 14M

Hive Earnings and CFO Interview, NVIDIA Backstops $500B OpenAI Site, Blue Energy’s 2.5 GW Gas/Nuke Build for Crusoe

from Blockspace: AI & Bitcoin · host Blockspace

Welcome back to The Blockspace Podcast! Today, we unpack Hive’s Q1 FY2027 earnings and take a look at their new $350M, 5-year AI cloud deal. For other interviews, Lygos Finance CEO Jay Patel joins us to break down NVIDIA’s latest backstop for OpenAI’s ...

Episode metadata supplied by the publisher feed · Published Aug 17, 2026

Embed this episode

NOW PLAYING

Hive Earnings and CFO Interview, NVIDIA Backstops $500B OpenAI Site, Blue Energy’s 2.5 GW Gas/Nuke Build for Crusoe

0:00 1:14:51

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Blockspace: AI & Bitcoin?

This episode is 1 hour and 14 minutes long.

When was this Blockspace: AI & Bitcoin episode published?

This episode was published on August 17, 2026.

Can I download this Blockspace: AI & Bitcoin episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!