EPISODE · Jul 13, 2021 · 0 MIN
Hormigon6Reyes
from Podcast continuidad
El Servicio de Evaluación Ambiental (SEA) aprobó el proyecto “Planta de Hormigón Premezclado Santiago Sur”, el cual se emplazará en el sector poniente de la comuna El Bosque y el sector norte de San Bernardo, un lugar reconocido por la actividad industrial y por los problemas de salud de acongojan a la ciudadanía.
Embed this episode
Ready to play
Hormigon6Reyes
0:00
0:22
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Podcast continuidad?
This episode is 0 minutes long.
When was this Podcast continuidad episode published?
This episode was published on July 13, 2021.
Can I download this Podcast continuidad episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!