EPISODE · Jun 18, 2016 · 28 MIN
Hotel Gori 16/2/2016 Entrevista a Francesc Rosa, regidor d’urbanisme i espais públics
from Hotel Gori
La passada setmana va iniciar-se la segona fase de la remodelació de l’enllumenat públic del carrer Anselm Clavé, les obres es preveu que durin un mes. Analitzem l’enllumenat d’Olesa de Montserrat i els projectes de millora
Embed this episode
NOW PLAYING
Hotel Gori 16/2/2016 Entrevista a Francesc Rosa, regidor d’urbanisme i espais públics
0:00
28:54
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
Frequently Asked Questions
How long is this episode of Hotel Gori?
This episode is 28 minutes long.
When was this Hotel Gori episode published?
This episode was published on June 18, 2016.
Can I download this Hotel Gori episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!