Hour 2: Juiced AZ
from The Chris & Joe Show
Arizona’s three largest electric utilities are teaming up to explore ways to meet rising demand through the expanded use of nuclear energy, with a possible new power plant envisioned 15 or more years out.
Embed this episode
No transcript yet.
Frequently asked questions
How long is this episode of The Chris & Joe Show?
This episode is 32 minutes long.
When was this The Chris & Joe Show episode published?
This episode was published on February 5, 2025.
Can I download this The Chris & Joe Show episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.