EPISODE · Jun 22, 2026 · 38 MIN
Hour 3: What went wrong with the S&WB pumps and the Carrollton Water Plant during Tropical Storm Arthur?
from Newell Normand
This hour, Newell is joined by New Orleans City Council President JP Morrell to give insight on the pump failures, the power outage at the Carrollton Water Plant during the aftermath of Tropical Storm Arthur, and what needs to be done to prevent similar problems in the future.
Embed this episode
NOW PLAYING
Hour 3: What went wrong with the S&WB pumps and the Carrollton Water Plant during Tropical Storm Arthur?
0:00
38:19
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
Frequently Asked Questions
How long is this episode of Newell Normand?
This episode is 38 minutes long.
When was this Newell Normand episode published?
This episode was published on June 22, 2026.
Can I download this Newell Normand episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!