Hour 3: What went wrong with the S&WB pumps and the Carrollton Water Plant during Tropical Storm Arthur? episode artwork

EPISODE · Jun 22, 2026 · 38 MIN

Hour 3: What went wrong with the S&WB pumps and the Carrollton Water Plant during Tropical Storm Arthur?

from Newell Normand

This hour, Newell is joined by New Orleans City Council President JP Morrell to give insight on the pump failures, the power outage at the Carrollton Water Plant during the aftermath of Tropical Storm Arthur, and what needs to be done to prevent similar problems in the future.

Episode metadata supplied by the publisher feed · Published Jun 22, 2026

Embed this episode

NOW PLAYING

Hour 3: What went wrong with the S&WB pumps and the Carrollton Water Plant during Tropical Storm Arthur?

0:00 38:19

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of Newell Normand?

This episode is 38 minutes long.

When was this Newell Normand episode published?

This episode was published on June 22, 2026.

Can I download this Newell Normand episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!