Skip to content
How Does The MRT3 Project Affect Property Valuation? episode artwork

May 13, 2022 22 min

How Does The MRT3 Project Affect Property Valuation?

from The Property Show Hosted by BFM Media

The MRT3 project has been revived recently, with an estimated construction cost of RM31 billion, and will involve the construction of 31 stations over 50 km of rail lines. En. Sulaiman Saheh, Director of Research, Rahim & Co International discusses connectivity and the valuation of property. Image credit: Shutterstock.com

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

How Does The MRT3 Project Affect Property Valuation?

0:00 22:47

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of The Property Show?

This episode is 22 minutes long.

When was this The Property Show episode published?

This episode was published on May 13, 2022.

Can I download this The Property Show episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.