How Electric Co-ops Drive Tennessee Solar + Battery Storage Growth episode artwork

EPISODE · Nov 20, 2025 · 19 MIN

How Electric Co-ops Drive Tennessee Solar + Battery Storage Growth

from Clean Power Hour · host Tim Montague, John Weaver

#320Today on the Clean Power Hour, Brandon Wagoner, Vice President of Strategy at Middle Tennessee Electric, explains how the second largest cooperative in America manages explosive EV adoption, deploys 32 megawatts of battery storage, and builds 113 megawatts of solar arrays while keeping rates low. His secret weapon: load factor optimization.Middle Tennessee Electric (MTE) serves 350,000 meters south and east of Nashville and leads Tennessee utilities in electric vehicle adoption. As the largest co-op in the Tennessee Valley Authority (TVA) service territory, MTE operates through strategic partnerships rather than vertical integration, working directly with TVA to solve generation and distribution challenges together.Key Discussion Points:• Load factor optimization as the primary metric for grid infrastructure decisions and rate management• 32 megawatts of two-hour battery storage deployment scheduled for Q1 2026 across their service territory• 3.25 MW tracking solar array operational, with 110 MW TVA solar project launching in 2028• Night Flex rate program incentivizing EV charging during six six-hour overnight windows• Community solar programs serving renters and members without rooftop installation options• Pro Solar advisory team provides trusted third-party guidance for members evaluating solar developers• Strategic approach to serving diverse demographics from high-income first adopters to conservative rural members• Co-op structure enables focus on member service rather than shareholder profits• Partnership model with TVA replaces traditional utility customer relationship• Programmatic rebates, including $50 EV charger installation incentivesConnect with Brandon WagonerWebsite: https://mte.com/LinkedIn: https://www.linkedin.com/company/midtnelectric/LinkedIn: https://www.linkedin.com/in/charles-brandon-wagoner-pe-2822146/ Support the showConnect with Tim  Clean Power Hour  Clean Power Hour on YouTubeTim on TwitterTim on LinkedIn Email [email protected] Review Clean Power Hour on Apple PodcastsThe Clean Power Hour is produced by the Clean Power Consulting Group and created by Tim Montague. Contact us by email:  [email protected] sponsors who share our mission to speed the energy transition are invited to check out https://www.cleanpowerhour.com/support/The Clean Power Hour is brought to you by CPS America, maker of North America’s number one 3-phase string inverter, with over 6GW shipped in the US. With a focus on commercial and utility-scale solar and energy storage, the company partners with customers to provide unparalleled performance and service. The CPS America product lineup includes 3-phase string inverters from 25kW to 275kW, exceptional data communication and controls, and energy storage solutions designed for seamless integration with CPS America systems.  Learn more at www.chintpowersystems.com

Episode metadata supplied by the publisher feed · Published Nov 20, 2025

Embed this episode

#320 Today on the Clean Power Hour, Brandon Wagoner, Vice President of Strategy at Middle Tennessee Electric, explains how the second largest cooperative in America manages explosive EV adoption, deploys 32 megawatts of battery storage, and builds 113 megawatts of solar arrays while keeping rates low. His secret weapon: load factor optimization. Middle Tennessee Electric (MTE) serves 350,000 meters south and east of Nashville and leads Tennessee utilities in electric vehicle adoption. As the ...

Distinct summary based on available episode metadata or transcript content.

NOW PLAYING

How Electric Co-ops Drive Tennessee Solar + Battery Storage Growth

0:00 19:20

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Clean Power Hour?

This episode is 19 minutes long.

When was this Clean Power Hour episode published?

This episode was published on November 20, 2025.

Is there a transcript available for this episode?

Yes, a full transcript is available for this episode. You can read the complete transcript on the episode page.

Can I download this Clean Power Hour episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!