Skip to content
How linear generators can fit into the Texas grid episode artwork

Aug 5, 2026 36 min

How linear generators can fit into the Texas grid

from Energy Capital Podcast Hosted by Nate

Wind, solar, and storage are the only new categories of generation to reach the US power system at scale in fifty years. Craig Gordon thinks his company is adding one. Mainspring Energy’s linear generator drives magnets through copper coils rather than burning fuel in a flame, switches between natural gas, biogas, propane, and hydrogen under load, and ramps from minimum to full output in 25 seconds. The same modular unit is going into a municipal utility’s fleet in Utah, an islanded truck depot in Los Angeles, dairy digesters in California, and data centers. It is still a gas-fired resource. The flameless reaction suppresses NOx rather than carbon, and the carbon case rests on burning less fuel per megawatt hour than the engines and turbines it displaces. In ERCOT it arrives at a useful moment. Large load requests run into the hundreds of gigawatts, most of them data centers, against a small fraction approved to energize. The Batch Zero process approved in June will sort which projects get firm grid capacity, and generation on a customer’s own site never enters it. Gordon does not treat that as a substitute for building the grid, and says the answer is both. On this week’s Energy Capital Podcast, Matt Boms talks with Craig Gordon, head of business development for Mainspring, who heads global policy and regulatory affairs at Mainspring after 12 years at Invenergy. The conversation covers: * How a linear generator works, magnets driven through copper coils 13 times a second, with no flame, water, or oil. * Where the units are going, a 48 MW project for a Utah municipal utility and a Los Angeles depot charging 96 electric trucks with no grid connection. * What it burns, natural gas today, with dairy and landfill biogas running in California at small scale and hydrogen far off at current production costs. * Running alongside solar and batteries, covering the hours renewables do not, and how it compares with engines, turbines, and fuel cells. How much of ERCOT’s queued load ends up served on site rather than through the grid will shape what Texas has to build. Chapters: 00:00 – Introduction and Guest Background 00:40 – From Ameren to Invenergy to Mainspring 03:43 – What Mainspring Builds and Why It Matters 06:19 – How a Linear Generator Works 08:39 – Why Customers Are Generating Power Locally 11:02 – Data Centers, DERs, and Grid Investment 12:16 – Ramping and Efficiency vs Engines, Turbines, and Fuel Cells 14:27 – UMPA's 48 MW Project and the Prologis Microgrid 17:28 – Maintenance, O&M Hubs, and Field Lessons 18:39 – Fuel Flexibility, Biogas, and Hydrogen 20:36 – Scaling to Hundreds of Megawatts, and Islanded vs Grid-Parallel 25:37 – ERCOT's Cluster Study and the Interconnection Queue 29:21 – Policy Barriers, Air Permits, and Behind-the-Meter Value 33:57 – Linear Generators in 10 Years This is a public episode. If you'd like to discuss this with other subscribers or get access to bonus episodes, visit www.texasenergyandpower.com/subscribe

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

How linear generators can fit into the Texas grid

0:00 36:26

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Energy Capital Podcast?

This episode is 36 minutes long.

When was this Energy Capital Podcast episode published?

This episode was published on August 5, 2026.

Can I download this Energy Capital Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.