How not to do feasibility studies | #Railnatter 261 episode artwork

EPISODE · May 14, 2025 · 57 MIN

How not to do feasibility studies | #Railnatter 261

from #Railnatter · host Gareth Dennis

We're looking at the proposals for a new line connecting the North Wales Main Line and the Cambrian Coast Line between Bangor and Afon Wen... Are the plans any good? Should they go ahead even if the correct route for a north-south Welsh mainline is at the other side of the country? Way back in Episode 57 we analysed where any future north-south Welsh railway needed to be, and we fleshed those plans out into the Dragon Line/Llinell Y Ddraig in Episode 116. Let's see how this report aligns with that - or doesn't. Download the report here: https://www.gov.wales/sites/default/files/publications/2025-02/re-opening-the-bangor-to-afon-wen-rail-line-feasibility-study.pdf Enjoyed this? Please do consider supporting #Railnatter at https://patreon.com/garethdennis or throw loose change at me via https://paypal.me/garethdennis. Merch at https://garethdennis.co.uk/merch. Join in the discussion at https://garethdennis.co.uk/discord. You can also buy my book #HowTheRailwaysWillFixTheFuture: https://bit.ly/HowTheRailways

We're looking at the proposals for a new line connecting the North Wales Main Line and the Cambrian Coast Line between Bangor and Afon Wen... Are the plans any good? Should they go ahead even if the correct route for a north-south Welsh mainline is at the other side of the country? Way back in Episode 57 we analysed where any future north-south Welsh railway needed to be, and we fleshed those plans out into the Dragon Line/Llinell Y Ddraig in Episode 116. Let's see how this report aligns with that - or doesn't. Download the report here: https://www.gov.wales/sites/default/files/publications/2025-02/re-opening-the-bangor-to-afon-wen-rail-line-feasibility-study.pdf Enjoyed this? Please do consider supporting #Railnatter at https://patreon.com/garethdennis or throw loose change at me via https://paypal.me/garethdennis. Merch at https://garethdennis.co.uk/merch. Join in the discussion at https://garethdennis.co.uk/discord. You can also buy my book #HowTheRailwaysWillFixTheFuture: https://bit.ly/HowTheRailways

NOW PLAYING

How not to do feasibility studies | #Railnatter 261

0:00 57:04

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of #Railnatter?

This episode is 57 minutes long.

When was this #Railnatter episode published?

This episode was published on May 14, 2025.

What is this episode about?

We're looking at the proposals for a new line connecting the North Wales Main Line and the Cambrian Coast Line between Bangor and Afon Wen... Are the plans any good? Should they go ahead even if the correct route for a north-south Welsh mainline is...

Can I download this #Railnatter episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!