EPISODE · Jul 19, 2026 · 9 MIN
How One Factory Cut Changeover Time 70 Percent With One SMED Tweak
from The Operator's Manual with Fexingo: Daily Decisions, Tactical Wins, and Business Execution · host Fexingo
In this episode, Lucas and Luna break down how a mid-size automotive parts supplier in Ohio cut die-changeover time from 90 minutes to 27 minutes using a single SMED (Single-Minute Exchange of Die) principle. They walk through the specific change: converting internal setup steps to external setup by pre-heating dies offline. The result? 70 percent faster changeovers, 12 percent more uptime, and $1.8 million in annual savings. Lucas frames it as a case study in bottleneck thinking, not just lean theory. Luna pushes back on whether all shops can pull this off without capital investment. They close on the question: what's your equivalent of the pre-heated die? #SMED #LeanManufacturing #ChangeoverReduction #ToyotaProductionSystem #BottleneckAnalysis #OperationalExcellence #ManufacturingEfficiency #DieChangeover #SingleMinuteExchangeOfDie #OhioManufacturing #ProcessImprovement #ContinuousImprovement #BusinessExecution #TheOperatorsManual #FexingoBusiness #BusinessPodcast #DailyDecisions #TacticalWins Keep every episode free: buymeacoffee.com/fexingo
Embed this episode
NOW PLAYING
How One Factory Cut Changeover Time 70 Percent With One SMED Tweak
No transcript for this episode yet
Similar Episodes
Similar Podcasts
No similar podcasts found.