How PJM Is Grappling With Data Center Power Demand episode artwork

EPISODE · Feb 3, 2026 · 1H 4M

How PJM Is Grappling With Data Center Power Demand

from Energy Policy Now · host Kleinman Center for Energy Policy

The nation’s largest electric grid operator outlines its plan to manage rapid growth in data center electricity demand. --- PJM Interconnection, the nation’s largest grid operator, is preparing to file a wide-ranging proposal with federal regulators aimed at managing the rapid growth of electricity demand, including AI-driven data centers. The plan stands out as one of the first comprehensive efforts by a grid operator to address surging load from new technologies while maintaining system reliability and limiting cost impacts on consumers. The proposal arrives at a moment when the electric grid is under growing stress. Tightening power supply-demand balances, high-profile grid failures, and a series of narrowly avoided outages have raised concerns about whether the power system can continue to meet demand reliably. At the same time, those pressures have increasingly shown up in electricity prices, which have increased sharply in many areas. PJM’s proposal tries to answer a question grid operators across the country are now facing: how to say “yes” to large new loads without turning reliability into a gamble or costs into an afterthought. The plan lays out a structured approach to integrating data centers and other large loads, with an eye toward keeping commitments realistic and aligning responsibility with impact. Abe Silverman is an assistant research scholar with the Ralph O’Connor Sustainable Energy Institute at Johns Hopkins University and a former general counsel to the New Jersey Board of Public Utilities. Tom Rutigliano is senior advocate for climate and energy at the Natural Resources Defense Council, where his work focuses on PJM. Both participated in the policy discussions surrounding PJM’s proposal, and provide their perspective on its potential impacts on grid reliability, consumers, and the potential rate of datacenter growth. Abe Silverman is an assistant research scholar with the Ralph O’Connor Sustainable Energy Institute at Johns Hopkins University and a former general counsel to the New Jersey Board of Public Utilities. Tom Rutigliano is senior advocate for climate and energy at the Natural Resources Defense Council, where his work focuses on PJM. Related Content Communities Are at Risk If We Don’t Slow the Roll on Data Center Development https://kleinmanenergy.upenn.edu/commentary/blog/communities-are-at-risk-if-we-dont-slow-the-roll-on-data-center-development/ Energy System Planning: New Models for Accelerating Decarbonization https://kleinmanenergy.upenn.edu/research/publications/energy-system-planning-new-models-for-accelerating-decarbonization/ Energy Policy Now is produced by The Kleinman Center for Energy Policy at the University of Pennsylvania. For all things energy policy, visit kleinmanenergy.upenn.edu.See omnystudio.com/listener for privacy information.

Episode metadata supplied by the publisher feed · Published Feb 3, 2026

Embed this episode

The nation’s largest electric grid operator outlines its plan to manage rapid growth in data center electricity demand.

Distinct summary based on available episode metadata or transcript content.

Ready to play

How PJM Is Grappling With Data Center Power Demand

0:00 1:04:03

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Energy Policy Now?

This episode is 1 hour and 4 minutes long.

When was this Energy Policy Now episode published?

This episode was published on February 3, 2026.

Can I download this Energy Policy Now episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!