How to do a Job Cost Projection: Cutting through the Fog – Part 2

from Build America Podcast · host Scott Jennings

Let’s run through an example. Let’s do an example so you see some of the challenges. Let’s take one cost code in your budget – let’s look at roadway subgrade. Below we have the budget for this cost. You can see the cost code is “1001” and there are five cost components of this cost code: labor, equipment, consumable material, permanent material, and subcontractor cost. This can be viewed in the columns from “Cost Code” to “Budget($)”. http://sjcivil.net/news/how-to-do-a-job-cost-projection-cutting-through-the-fog-part-2/

Episode metadata supplied by the publisher feed · Published Aug 3, 2020

Embed this episode

NOW PLAYING

How to do a Job Cost Projection: Cutting through the Fog – Part 2

0:00 13:51

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Build America Podcast?

This episode is 13 minutes long.

When was this Build America Podcast episode published?

This episode was published on August 3, 2020.

Can I download this Build America Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!