Skip to content
How to Factory Staging Project work (osc16) episode artwork

Jun 21, 2016 21 min

How to Factory Staging Project work (osc16)

from Chaos Computer Club - archive feed (high quality) Hosted by Max

Factory Staging Project is very important part of openSUSE Factory development model now, it's a gate to make sure new packages update/change will not break openSUSE Factory totally and we can safety to release newer openSUSE Tumbleweed snapshot. I'll introduce how to Factory Staging Project work in this talk, including the workflow, the tools behind of Staging Project and the client-side tool we are used to. This talk should give openSUSE developers a clear picture about how Staging Master(s) handling Staging Project. about this event: https://c3voc.de

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

How to Factory Staging Project work (osc16)

0:00 21:37

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Chaos Computer Club - archive feed (high quality)?

This episode is 21 minutes long.

When was this Chaos Computer Club - archive feed (high quality) episode published?

This episode was published on June 21, 2016.

Can I download this Chaos Computer Club - archive feed (high quality) episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.