How to Fix Britain's Railways episode artwork

EPISODE · Jan 26, 2023 · 28 MIN

How to Fix Britain's Railways

from The Briefing Room · host BBC Radio 4

The next round of rail strikes look set to compound long-running problems with Britain's railways. But the problems on the network go far beyond this spate of industrial action. David Aaronvitch asks the experts in The Briefing Room this week the reasons why our rail network has acquired such a reputation for unreliability, and what can be done to put it right. Contributors: Christian Wolmar Mark Smith Jennifer Williams Gareth DennisProducers: Kirsteen Knight Ben Carter Daniel GordonProduction Coordinators: Siobhan Reed Sophie HillSound mix: Rod FarquharEditor: Richard VadonImage: Train timetable board Credit: Martin Pope via Getty

Episode metadata supplied by the publisher feed · Published Jan 26, 2023

Embed this episode

NOW PLAYING

How to Fix Britain's Railways

0:00 28:45

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Briefing Room?

This episode is 28 minutes long.

When was this The Briefing Room episode published?

This episode was published on January 26, 2023.

Can I download this The Briefing Room episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!