How's the Taichung MRT so far? episode artwork

EPISODE · May 11, 2021 · 13 MIN

How's the Taichung MRT so far?

from Taiwan Talk · host ICRT

Otis Sheu (許泰銘) heads the operations division for Taichung's newly opened Mass Rapid Transit… And ICRT Taichung correspondent Donovan Smith adds some perspective as a longtime resident of the city. The Taichung MRT Green Line is the first step in a more closely connected Taichung City, with a Blue Line and an Orange Line slated for construction over the next decade or so. If you're in the area, check it out! Thanks for listening! -- Hosting provided by SoundOn

Episode metadata supplied by the publisher feed · Published May 11, 2021

Embed this episode

NOW PLAYING

How's the Taichung MRT so far?

0:00 13:01

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Taiwan Talk?

This episode is 13 minutes long.

When was this Taiwan Talk episode published?

This episode was published on May 11, 2021.

Can I download this Taiwan Talk episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!