EPISODE · May 20, 2026 · 2H 18M
HS2 Costs now over £100BN
from Nick Ferrari - The Whole Show
HS2 costs spiral over £100bn as the completion date pushed back, and the trains get slower. Arsenal win the league, and the latest on the Post Office Horizon scandal.
Embed this episode
NOW PLAYING
HS2 Costs now over £100BN
0:00
2:18:01
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Nick Ferrari - The Whole Show?
This episode is 2 hours and 18 minutes long.
When was this Nick Ferrari - The Whole Show episode published?
This episode was published on May 20, 2026.
Can I download this Nick Ferrari - The Whole Show episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!