Skip to content
HS2: On Track? episode artwork

Aug 26, 2021 28 min

HS2: On Track?

from The Briefing Room Hosted by BBC Radio 4

HS2, a high-speed railway linking up London, the Midlands and the North of England has been in development for more than a decade. It was described by Boris Johnson as the ‘spine’ of a new network to deal with the ‘great musculoskeletal problem of UK transport’. The ‘spine’ is costing an arm and a leg. In 2012 the project was priced at £32.7bn. That was revised to £55bn in 2015. Last year a review by civil engineer Doug Oakervee said the final figure could top £100bn. The Chancellor Rishi Sunak has already warned that Covid has severely damaged public finances and that will likely impact decisions made in the comprehensive spending review taking place this autumn. So how is HS2 progressing and is its completion threatened by its rising costs? Joining David Aaronovitch in The Briefing Room are - Nick Kingsley, Managing Editor of Railway Gazette International Bridget Rosewell, Commissioner, National Infrastructure Commission George Parker, political editor at the Financial Times Tony Travers, Professor in the School of Public Policy at the London School of Economics Producers: Ben Carter, Kirsteen Knight and Sharon Hemans Editor: Jasper Corbett Sound Engineer: Neil Churchill

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

HS2: On Track?

0:00 28:46

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of The Briefing Room?

This episode is 28 minutes long.

When was this The Briefing Room episode published?

This episode was published on August 26, 2021.

Can I download this The Briefing Room episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.