HS2: On Track? episode artwork

EPISODE · Aug 26, 2021 · 28 MIN

HS2: On Track?

from The Briefing Room · host BBC Radio 4

HS2, a high-speed railway linking up London, the Midlands and the North of England has been in development for more than a decade. It was described by Boris Johnson as the ‘spine’ of a new network to deal with the ‘great musculoskeletal problem of UK transport’. The ‘spine’ is costing an arm and a leg. In 2012 the project was priced at £32.7bn. That was revised to £55bn in 2015. Last year a review by civil engineer Doug Oakervee said the final figure could top £100bn. The Chancellor Rishi Sunak has already warned that Covid has severely damaged public finances and that will likely impact decisions made in the comprehensive spending review taking place this autumn. So how is HS2 progressing and is its completion threatened by its rising costs?Joining David Aaronovitch in The Briefing Room are -Nick Kingsley, Managing Editor of Railway Gazette International Bridget Rosewell, Commissioner, National Infrastructure Commission George Parker, political editor at the Financial Times Tony Travers, Professor in the School of Public Policy at the London School of EconomicsProducers: Ben Carter, Kirsteen Knight and Sharon Hemans Editor: Jasper Corbett Sound Engineer: Neil Churchill

Episode metadata supplied by the publisher feed · Published Aug 26, 2021

HS2, a high-speed railway linking up London, the Midlands and the North of England has been in development for more than a decade. It was described by Boris Johnson as the ‘spine’ of a new network to deal with the ‘great musculoskeletal problem of UK transport’. The ‘spine’ is costing an arm and a leg. In 2012 the project was priced at £32.7bn. That was revised to £55bn in 2015. Last year a review by civil engineer Doug Oakervee said the final figure could top £100bn. The Chancellor Rishi Sunak has already warned that Covid has severely damaged public finances and that will likely impact decisions made in the comprehensive spending review taking place this autumn. So how is HS2 progressing and is its completion threatened by its rising costs?Joining David Aaronovitch in The Briefing Room are -Nick Kingsley, Managing Editor of Railway Gazette International Bridget Rosewell, Commissioner, National Infrastructure Commission George Parker, political editor at the Financial Times Tony Travers, Professor in the School of Public Policy at the London School of EconomicsProducers: Ben Carter, Kirsteen Knight and Sharon Hemans Editor: Jasper Corbett Sound Engineer: Neil Churchill

PodParley-generated summary based on available episode metadata and transcript content.

NOW PLAYING

HS2: On Track?

0:00 28:46

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

Frequently Asked Questions

How long is this episode of The Briefing Room?

This episode is 28 minutes long.

When was this The Briefing Room episode published?

This episode was published on August 26, 2021.

What is this episode about?

HS2, a high-speed railway linking up London, the Midlands and the North of England has been in development for more than a decade. It was described by Boris Johnson as the ‘spine’ of a new network to deal with the ‘great musculoskeletal problem of...

Can I download this The Briefing Room episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!