'Huge Frustration & Anger' Over Cost Overruns In Public Sector - Minister For Public Expenditure episode artwork

EPISODE · Feb 25, 2025 · 20 MIN

'Huge Frustration & Anger' Over Cost Overruns In Public Sector - Minister For Public Expenditure

from The Last Word with Matt Cooper

Gabija Gataveckaite, political correspondent with the Irish Independent, and Peadar Toibin, leader of Aontú, join The Last Word as it has been revealed that a scanner at the National Gallery, which cost almost €125,000, has been lying idle for eight years.Minister for Public Expenditure and Reform Jack Chambers also joins to Matt to discuss the ‘huge frustration and anger’ among taxpayers over cost overruns in the public sector.Catch the full discussion by pressing the 'Play' button on this page!

Episode metadata supplied by the publisher feed · Published Feb 25, 2025

Embed this episode

NOW PLAYING

'Huge Frustration & Anger' Over Cost Overruns In Public Sector - Minister For Public Expenditure

0:00 20:22

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Last Word with Matt Cooper?

This episode is 20 minutes long.

When was this The Last Word with Matt Cooper episode published?

This episode was published on February 25, 2025.

Can I download this The Last Word with Matt Cooper episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!