EPISODE · Nov 19, 2019 · 1 MIN
火车晚点了 late/overdue/behind schedule
from 秒杀中式英语:地道表达告别尴尬
Embed this episode
NOW PLAYING
火车晚点了 late/overdue/behind schedule
0:00
1:04
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of 秒杀中式英语:地道表达告别尴尬?
This episode is 1 minute long.
When was this 秒杀中式英语:地道表达告别尴尬 episode published?
This episode was published on November 19, 2019.
Can I download this 秒杀中式英语:地道表达告别尴尬 episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!