EPISODE · Jul 31, 2026 · 1H 16M
Hut 8’s $5B Illinois Site, Kimi K3 Trained on H200s, GPU Rental Price Contango
from Blockspace: AI & Bitcoin · host Blockspace
Welcome back to The Blockspace Podcast! For our lead story today, we cover how zoning for Hut 8’s $5B, 500 MW data center in Illinois has been stalled as a local council cancels a zoning vote for the project, and we also cover a Bloomberg report that M...
Embed this episode
NOW PLAYING
Hut 8’s $5B Illinois Site, Kimi K3 Trained on H200s, GPU Rental Price Contango
0:00
1:16:22
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Blockspace: AI & Bitcoin?
This episode is 1 hour and 16 minutes long.
When was this Blockspace: AI & Bitcoin episode published?
This episode was published on July 31, 2026.
Can I download this Blockspace: AI & Bitcoin episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!