I-65 Reopens Early in Louisville | Lexington News episode artwork

EPISODE · Sep 11, 2026 · 1 MIN

I-65 Reopens Early in Louisville | Lexington News

from Lexington News Today | 2 Min News | The Daily News Now!

Louisville’s I-65 is back open ahead of schedule—two lanes in each direction restored after a two-month bridge replacement project. Governor Beshear pledged no full shutdown next summer, saving at least a year of construction headaches. The $150 million project will finish by March 2027, replacing nine bridges built in the 1950s. While detours via I-264 remain for through traffic, most locals are back on the main artery—with sidewalk and lighting upgrades planned for later. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/61496515a1236a02

Episode metadata supplied by the publisher feed · Published Sep 11, 2026

Embed this episode

Ready to play

I-65 Reopens Early in Louisville | Lexington News

0:00 1:38

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Lexington News Today | 2 Min News | The Daily News Now!?

This episode is 1 minute long.

When was this Lexington News Today | 2 Min News | The Daily News Now! episode published?

This episode was published on September 11, 2026.

Can I download this Lexington News Today | 2 Min News | The Daily News Now! episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!