Skip to content
IB - Strata Parent Parcel Requirements episode artwork

EPISODE · Feb 26, 2026 · 39 MIN

IB - Strata Parent Parcel Requirements

from Storman Norman Presents · host Storman Norman

You cannot build a strata on a shaky foundation. We illuminate the mandatory requirement to fully re-establish the "Parent Parcel" before any strata plan can be filed. Learn why cutting corners on the external boundary is the fastest way to a disciplinary hearing. Key Study Points: Full Re-establishment: Why the entire perimeter of the land must be surveyed and proven. The Containment Rule: Ensuring the new building is 100% within the proven bounds. The Exam Trap: Assuming a recently surveyed boundary by another firm allows you to skip tying into the legal monuments for your own strata plan. Sources & Required Reading: ABCLS IB - Strata Parent Parcel Requirements Strata Property Act Survey and Plan Rules 08 - PRM Chapter 9 (Strata Title Surveys) 07 - PRM Chapter 8 (Principles of Boundary Surveys) Resources: IB PDF | Infographic | Quiz

Episode metadata supplied by the publisher feed · Published Feb 26, 2026

Embed this episode

Ready to play

IB - Strata Parent Parcel Requirements

0:00 39:42

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of Storman Norman Presents?

This episode is 39 minutes long.

When was this Storman Norman Presents episode published?

This episode was published on February 26, 2026.

Can I download this Storman Norman Presents episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!