Skip to content
IBR Bridge Safety: Trucks Capped at 20 MPH? episode artwork

Sep 8, 2026

IBR Bridge Safety: Trucks Capped at 20 MPH?

from Clark County Today News

Seattle engineer Bob Ortblad used AI to analyze the IBR's temporary diversion design, a 76-foot-wide roadway meant to carry six lanes of traffic. The result: a safe speed of 30 mph for cars and just 20 mph for trucks in dry conditions, dropping further in wind, rain, or ice. Ortblad also says IBR administrator Carley Francis has refused to allow WSDOT and ODOT safety engineers to conduct an independent safety analysis of the bridge design. https://clarkcountytoday.com/opinion/letter-ibrs-top-truck-speed-20-mph/ #IBR #Interstatebridge #BridgeSafety #Transportation #WashingtonState #ClarkCounty #Opinion #Infrastructure #Vancouver #WSDOT

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

IBR Bridge Safety: Trucks Capped at 20 MPH?

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

When was this Clark County Today News episode published?

This episode was published on September 8, 2026.

Can I download this Clark County Today News episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.