Illinois 251 bridge repairs in Peru begins July 13 episode artwork

EPISODE · Jul 13, 2026 · 1 MIN

Illinois 251 bridge repairs in Peru begins July 13

from Illinois Valley - Shaw Local · host Shaw Local News Network

One lane will be open in each direction of Illinois 251, and there will be occasional lane closures on I-80 during the $1.8 million project, which is expected to be completed in the fall.

Episode metadata supplied by the publisher feed · Published Jul 13, 2026

Embed this episode

NOW PLAYING

Illinois 251 bridge repairs in Peru begins July 13

0:00 1:56

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Illinois Valley - Shaw Local?

This episode is 1 minute long.

When was this Illinois Valley - Shaw Local episode published?

This episode was published on July 13, 2026.

Can I download this Illinois Valley - Shaw Local episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!