EPISODE · Jun 16, 2026 · 1 MIN
Illinois 40 bridge repairs in Bureau County to begin June 16
from Illinois Valley - Shaw Local · host Shaw Local News Network
Work will replace the bridge deck. The structure and the Hennepin Canal Trail underneath the bridge will be closed during the project.
Embed this episode
NOW PLAYING
Illinois 40 bridge repairs in Bureau County to begin June 16
0:00
1:42
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Illinois Valley - Shaw Local?
This episode is 1 minute long.
When was this Illinois Valley - Shaw Local episode published?
This episode was published on June 16, 2026.
Can I download this Illinois Valley - Shaw Local episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!