EPISODE · Aug 16, 2009 · 6 MIN
Importance of the Work Breakdown Structure (WBS) to the Project Cost Management
from 5 Minutes Podcast with Ricardo Vargas · host Ricardo Viana Vargas
In this podcast Ricardo discuss the relevance of the Work Breakdown Structure (WBS) to the Project Cost Management, specifically during the budget estimating. The podcast also discuss the influence of the WBS quality to the budget quality and the difference between cost and price in a project.
What this episode covers
In this podcast Ricardo discuss the relevance of the Work Breakdown Structure (WBS) to the Project Cost Management, specifically during the budget estimating. The podcast also discuss the influence of the WBS quality to the budget quality and the difference between cost and price in a project.
NOW PLAYING
Importance of the Work Breakdown Structure (WBS) to the Project Cost Management
No transcript for this episode yet
Similar Episodes
Mar 26, 2026 ·1m
Jan 2, 2026 ·47m
Dec 21, 2025 ·46m