Importance of the Work Breakdown Structure (WBS) to the Project Cost Management episode artwork

EPISODE · Aug 16, 2009 · 6 MIN

Importance of the Work Breakdown Structure (WBS) to the Project Cost Management

from 5 Minutes Podcast with Ricardo Vargas · host Ricardo Viana Vargas

In this podcast Ricardo discuss the relevance of the Work Breakdown Structure (WBS) to the Project Cost Management, specifically during the budget estimating. The podcast also discuss the influence of the WBS quality to the budget quality and the difference between cost and price in a project.

Episode metadata supplied by the publisher feed · Published Aug 16, 2009

Embed this episode

NOW PLAYING

Importance of the Work Breakdown Structure (WBS) to the Project Cost Management

0:00 6:23

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of 5 Minutes Podcast with Ricardo Vargas?

This episode is 6 minutes long.

When was this 5 Minutes Podcast with Ricardo Vargas episode published?

This episode was published on August 16, 2009.

Can I download this 5 Minutes Podcast with Ricardo Vargas episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!