EPISODE · Feb 4, 2025 · 1H
Impossible Metals Eureka III Plume Modeling Study
from Beyond Oil: The Rise of Critical Metals · host Impossible Metals
To fulfill the requirements for testing Eureka III within the BGR contract area in the Clarion Clipperton Zone, a plume modeling study is submitted to the International Seabed Authority as part of the Environmental Impact Statement.Tom Foster outlines the key assumptions and methodologies behind the sediment disturbance modeling for the proposed Eureka III test and presents the results of this analysis. This is a public episode. If you would like to discuss this with other subscribers or get access to bonus episodes, visit impossiblemetals.substack.com
NOW PLAYING
Impossible Metals Eureka III Plume Modeling Study
No transcript for this episode yet
Similar Episodes
Mar 26, 2026 ·1m
Mar 19, 2026 ·34m
Feb 18, 2026 ·11m
Feb 11, 2026 ·45m