Impossible Metals Eureka III Plume Modeling Study  episode artwork

EPISODE · Feb 4, 2025 · 1H

Impossible Metals Eureka III Plume Modeling Study

from Beyond Oil: The Rise of Critical Metals · host Impossible Metals

To fulfill the requirements for testing Eureka III within the BGR contract area in the Clarion Clipperton Zone, a plume modeling study is submitted to the International Seabed Authority as part of the Environmental Impact Statement.Tom Foster outlines the key assumptions and methodologies behind the sediment disturbance modeling for the proposed Eureka III test and presents the results of this analysis. This is a public episode. If you would like to discuss this with other subscribers or get access to bonus episodes, visit impossiblemetals.substack.com

Episode metadata supplied by the publisher feed · Published Feb 4, 2025

Embed this episode

NOW PLAYING

Impossible Metals Eureka III Plume Modeling Study

0:00 1:00:36

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Beyond Oil: The Rise of Critical Metals?

This episode is 1 hour and 0 minutes long.

When was this Beyond Oil: The Rise of Critical Metals episode published?

This episode was published on February 4, 2025.

Can I download this Beyond Oil: The Rise of Critical Metals episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!