Improvements at Waterfront Park episode artwork

EPISODE · Jun 25, 2026 · 26 MIN

Improvements at Waterfront Park

from Something to Talk About · host BISCC

BI Metro Park District Commissioner Rachel Pritchett and Parks Project Manager Matthew Keough join us to share information on some projects near the Senior & Community Center: plans to build stair across the ravine into Waypoint Woods and the replacement of the sailfloat off the Bainbridge City Dock.

Episode metadata supplied by the publisher feed · Published Jun 25, 2026

Embed this episode

NOW PLAYING

Improvements at Waterfront Park

0:00 26:03

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Something to Talk About?

This episode is 26 minutes long.

When was this Something to Talk About episode published?

This episode was published on June 25, 2026.

Can I download this Something to Talk About episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!