In Conversation with Isaac Mangena episode artwork

EPISODE · Jul 15, 2026 · 10 MIN

In Conversation with Isaac Mangena

from VOW 88.1 · host Pretty Ngwenya & KHANYISILE YENDE

On 14 July 2026, residents from Riverpark Phase 1, Phase 2, Phase 3, K206, Extension 9 and the Mahauzana Flats in Alexandra submitted a Memorandum of Demands to City Power following a peaceful march to the Alexandra Service Delivery Centre. The memorandum raised concerns regarding the electrification of the Mahauzana Flats, the upgrading of electricity infrastructure, improved responsiveness from City Power, and urgent intervention to address unsafe electrical infrastructure in the area. In response, City Power acknowledged receipt of the memorandum and reaffirmed its commitment to engaging with affected communities while respecting residents’ constitutional right to peaceful protest. The utility noted that the Mahauzana Flats are currently unlawfully occupied and that occupants are not registered City Power customers. According to City Power, the area is characterised by widespread illegal electricity and water connections, resulting in significant electricity theft and non-payment for municipal services. Instagram · Twitter

Episode metadata supplied by the publisher feed · Published Jul 15, 2026

Embed this episode

NOW PLAYING

In Conversation with Isaac Mangena

0:00 10:26

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of VOW 88.1?

This episode is 10 minutes long.

When was this VOW 88.1 episode published?

This episode was published on July 15, 2026.

Can I download this VOW 88.1 episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!