Infill Development, Flood Rebuilds, and The Affordability Crisis episode artwork

EPISODE · Aug 14, 2026 · 1H 37M

Infill Development, Flood Rebuilds, and The Affordability Crisis

from Tampa Bay Developer · host Garrett Greco

Domain Homes President Adam Mays and project manager and lot specialist Guy Frankenfield join Garrett Greco to reveal why Tampa Bay homes have become so expensive, how $400,000 lots, construction costs, city codes and flood regulations are reshaping Tampa and St. Petersburg real estate, and how builders are helping families rebuild after the 2024 hurricanes.00:00 Intro02:21 How city codes shape homes10:18 Cost to build a home21:40 CRA subsidies and affordability37:34 Inherited lots and generational wealth43:46 Flood zones and elevation costs53:53 Rebuilding after Helene1:07:14 Historic neighborhoods and design costs1:17:02 The alleyway problem1:31:21 Domain's podcast on a plane

Episode metadata supplied by the publisher feed · Published Aug 14, 2026

Embed this episode

NOW PLAYING

Infill Development, Flood Rebuilds, and The Affordability Crisis

0:00 1:37:55

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Tampa Bay Developer?

This episode is 1 hour and 37 minutes long.

When was this Tampa Bay Developer episode published?

This episode was published on August 14, 2026.

Can I download this Tampa Bay Developer episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!