Informativo 5/4/2024 episode artwork

EPISODE · Apr 5, 2024 · 1H 21M

Informativo 5/4/2024

from El Faradio

Contamos la extensión de la investigación de la trama de Carreteras, el inicio de las obras del tercer carril de la A-67 entre Polanco y Bezana, el ERTE ya negociado en Sidenor o el nuevo equipamiento tecnológico en Valdecilla.

Episode metadata supplied by the publisher feed · Published Apr 5, 2024

Embed this episode

NOW PLAYING

Informativo 5/4/2024

0:00 1:21:14

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of El Faradio?

This episode is 1 hour and 21 minutes long.

When was this El Faradio episode published?

This episode was published on April 5, 2024.

Can I download this El Faradio episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!