EPISODE · May 27, 2026 · 6 MIN
Informativos en Radio Casares | 27 de mayo de 2026
Primeros pasos para la obra integral de renovación de la calle Los Naranjos, en Secadero. Este proyecto históricamente demandado por los vecinos arrancará durante las primeras semanas de junio y supondrá un importante avance en las infraestructuras de la zona.
Embed this episode
Ready to play
Informativos en Radio Casares | 27 de mayo de 2026
0:00
6:07
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Podcast Radio Casares?
This episode is 6 minutes long.
When was this Podcast Radio Casares episode published?
This episode was published on May 27, 2026.
Can I download this Podcast Radio Casares episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!