Inside the $2.36 Billion Rays Stadium Deal
from The Ryan Gorman Show
Ryan breaks down the Tampa Bay Rays proposed $2.36 billion ballpark and mixed-use district deal, including the roles of Tampa, Hillsborough County, and the construction firms overseeing the project.
Embed this episode
No transcript yet.
Frequently asked questions
How long is this episode of The Ryan Gorman Show?
This episode is 11 minutes long.
When was this The Ryan Gorman Show episode published?
This episode was published on August 24, 2026.
Can I download this The Ryan Gorman Show episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.