Inside the Castle Spotlight on the Section 202 Program episode artwork

EPISODE · Jan 17, 2023 · 19 MIN

Inside the Castle Spotlight on the Section 202 Program

from Inside the Castle · host Unknown Author

In this episode we discuss the Section 202 Program with Brandon Moore, Huntington District, and Michael Moore, Louisville District. Section 202 was incorporated into the Energy and Water Development Act of 1981 (P.L. 96-367). Section 202 authorized the Corps to design and construct necessary and advisable flood control measures to prevent future flood damages at several named communities, in the Tug and Levisa Forks and Upper Cumberland River Basins. Listen in and learn about the Section 202 Program and specific projects currently being worked on under Section 202, like the Johnson County, KY Flood Risk Managment Project.

Episode metadata supplied by the publisher feed · Published Jan 17, 2023

Embed this episode

NOW PLAYING

Inside the Castle Spotlight on the Section 202 Program

0:00 19:56

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Inside the Castle?

This episode is 19 minutes long.

When was this Inside the Castle episode published?

This episode was published on January 17, 2023.

Can I download this Inside the Castle episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!