Skip to content
Insider Podcast-Road Projects Update episode artwork

Mar 30, 2022 29 min

Insider Podcast-Road Projects Update

from City of Murfreesboro, TN - Government Hosted by cityofmurfreesborotn

Road improvements slated in 2022 are highlighted on this episode of “The Insider,” the City’s official podcast. Chris Griffith, executive director for Public Infrastructure, highlights multiple projects. Improving traffic flow and reducing traffic congestion is the aim of major street improvements to widen roadways or add turn lanes, as well as sidewalks and multi-use paths. The Rutherford Blvd. Extension is the latest of these improvements to be announced and approved by City Council. This 30-minute edition of “The Insider” features: • A new pedestrian-friendly bridge on Brinkley Road near Blaze Drive and Timber Creek • Chaffin Place at Old Fort Parkway and Thompson Lane • Phase 2 of Rucker Lane between Muirwood Blvd. and Hwy 96 (Franklin Road) • Beasie Road and River Rock Blvd. Connector Bridge • Phase 2 of New Salem Hwy east of I-24 to Old Fort Parkway

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Insider Podcast-Road Projects Update

0:00 29:53

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of City of Murfreesboro, TN - Government?

This episode is 29 minutes long.

When was this City of Murfreesboro, TN - Government episode published?

This episode was published on March 30, 2022.

Can I download this City of Murfreesboro, TN - Government episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.