Skip to content
Inspecting Britain's Nuclear Power Plants episode artwork

Apr 21, 2011 27 min

Inspecting Britain's Nuclear Power Plants

from The Report Hosted by BBC Radio 4

The stricken Fukushima nuclear power plant in Japan missed scheduled safety inspections weeks before the disaster. The Japanese regulation system stands accused of failing to take the risk of an extreme natural disaster seriously enough, and of a lack of openness with the public. Britain's own regulatory body which oversees nuclear power plants has just re-launched itself after years of concern that it has been secretive, understaffed and overstretched. In recent years the government's Chief Nuclear Inspector says he has struggled to recruit new staff and that the Nuclear Safety Inspectorate faced major challenges to ensure old nuclear plants are run safely. As the Office for Nuclear Regulation takes on the challenge of ensuring Britain's nuclear power plants are run safely, Andy Denwood investigates whether it's up to the job. Producer Ian Muir-Cochrane.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Inspecting Britain's Nuclear Power Plants

0:00 27:53

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of The Report?

This episode is 27 minutes long.

When was this The Report episode published?

This episode was published on April 21, 2011.

Can I download this The Report episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.