Instant Resolution of Contractor Overhead Daily Cost episode artwork

EPISODE · Apr 16, 2019 · 6 MIN

Instant Resolution of Contractor Overhead Daily Cost

from Build America Podcast · host Scott Jennings

Projects often experience delays for which the Contractor is awarded additional time.  The determination of the per day reimbursement to the Contractor for this time is fraught with protracted analysis and negotiation.  Owners should consider the time related overhead bid item for instant resolution. http://sjcivil.net/claims/instant-resolution-of-contractor-overhead-daily-cost/

Episode metadata supplied by the publisher feed · Published Apr 16, 2019

Embed this episode

NOW PLAYING

Instant Resolution of Contractor Overhead Daily Cost

0:00 6:30

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Build America Podcast?

This episode is 6 minutes long.

When was this Build America Podcast episode published?

This episode was published on April 16, 2019.

Can I download this Build America Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!