Skip to content
Integra Resources’ Multi-Asset Strategy for Resource Expansion episode artwork

Apr 10, 2026 16 min

Integra Resources’ Multi-Asset Strategy for Resource Expansion

from Mining Stock Daily Hosted by Trevor Hall

Integra Resources is kicking off the largest drill program in its history. In an interview with Mining Stock Daily, President & CEO George Salamis said the 50,000-meter campaign focuses on expanding mineral resources and extending mine life across three key assets in the Great Basin. The program allocates the majority of its drilling to the producing Florida Canyon Mine in Nevada, with additional work planned for the DeLamar Project in Idaho and the Nevada North Project. Results from these efforts are intended to support upcoming feasibility studies and increase production at Florida Canyon Mine.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Integra Resources’ Multi-Asset Strategy for Resource Expansion

0:00 16:01

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Mining Stock Daily?

This episode is 16 minutes long.

When was this Mining Stock Daily episode published?

This episode was published on April 10, 2026.

Can I download this Mining Stock Daily episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.