INTRANT ejecutará obras en el malecón para reducir la alta velocidad y convertirlo en una ruta familiar y turística episode artwork

EPISODE · Dec 10, 2025 · 15 MIN

INTRANT ejecutará obras en el malecón para reducir la alta velocidad y convertirlo en una ruta familiar y turística

from El Ritmo de la Mañana · host FourMedia

Episode metadata supplied by the publisher feed · Published Dec 10, 2025

Embed this episode

Ready to play

INTRANT ejecutará obras en el malecón para reducir la alta velocidad y convertirlo en una ruta familiar y turística

0:00 15:24

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of El Ritmo de la Mañana?

This episode is 15 minutes long.

When was this El Ritmo de la Mañana episode published?

This episode was published on December 10, 2025.

Is there a transcript available for this episode?

Yes, a full transcript is available for this episode. You can read the complete transcript on the episode page.

Can I download this El Ritmo de la Mañana episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!