EPISODE · Nov 11, 2025 · 22 MIN
IREN - Childress Facility Tour & Analysis!
from Power Analysis · host Anthony Power & Bryce McNallie
We tour IREN’s Childress campus to see how power, cooling, and repeatable design create a mega-scale platform for Bitcoin mining today and HPC AI tomorrow. From grid ties and substation planning to closed-loop water and 20-year infrastructure, we map the strategy behind the Microsoft deal.• community impact in Childress and local hiring• 750 MW campus scale with 500 MW operating• grid-connected power and 345 kV lines• substation readiness and long-lead equipment• air-cooled Bitcoin halls and noise control• onsite repair shop and uptime culture• closed-loop cooling, wells and water logistics• Microsoft five-year GPUs vs 20-year buildings• future-proofing for higher rack density• safety, security and site operations at scaleHit the like button if you're an iron shareholder, and feel free to subscribeAnthonys Info:Website:https://www.powermininganalysis.comX: https://twitter.com/cazenove_ukPatreon:https://www.patreon.com/Cazenove_UKBryce's Info:X:https://twitter.com/McnallieMPatreon:https://www.patreon.com/McNallieMoneyMerch:https://shop.mcnalliemoney.com/Website:https://www.mcnalliemoney.comBusiness Inquiries:Email - [email protected]
What this episode covers
We tour IREN’s Childress campus to see how power, cooling, and repeatable design create a mega-scale platform for Bitcoin mining today and HPC AI tomorrow. From grid ties and substation planning to closed-loop water and 20-year infrastructure, we map the strategy behind the Microsoft deal. • community impact in Childress and local hiring • 750 MW campus scale with 500 MW operating • grid-connected power and 345 kV lines • substation readiness and long-lead equipment • air-cooled Bitcoin hall...
NOW PLAYING
IREN - Childress Facility Tour & Analysis!
No transcript for this episode yet
Similar Episodes
Sep 29, 2023 ·76m
Sep 29, 2023 ·73m
Sep 29, 2023 ·72m
Sep 29, 2023 ·75m
Sep 29, 2023 ·75m
Sep 29, 2023 ·73m