EPISODE · Nov 11, 2025 · 22 MIN
IREN - Childress Facility Tour & Analysis!
from Power Analysis · host Anthony Power & Bryce McNallie
We tour IREN’s Childress campus to see how power, cooling, and repeatable design create a mega-scale platform for Bitcoin mining today and HPC AI tomorrow. From grid ties and substation planning to closed-loop water and 20-year infrastructure, we map the strategy behind the Microsoft deal.• community impact in Childress and local hiring• 750 MW campus scale with 500 MW operating• grid-connected power and 345 kV lines• substation readiness and long-lead equipment• air-cooled Bitcoin halls and noise control• onsite repair shop and uptime culture• closed-loop cooling, wells and water logistics• Microsoft five-year GPUs vs 20-year buildings• future-proofing for higher rack density• safety, security and site operations at scaleHit the like button if you're an iron shareholder, and feel free to subscribeAnthonys Info:Website:https://www.powermininganalysis.comX: https://twitter.com/cazenove_ukPatreon:https://www.patreon.com/Cazenove_UKBryce's Info:X:https://twitter.com/McnallieMPatreon:https://www.patreon.com/McNallieMoneyMerch:https://shop.mcnalliemoney.com/Website:https://www.mcnalliemoney.comBusiness Inquiries:Email - [email protected]
Embed this episode
What this episode covers
We tour IREN’s Childress campus to see how power, cooling, and repeatable design create a mega-scale platform for Bitcoin mining today and HPC AI tomorrow. From grid ties and substation planning to closed-loop water and 20-year infrastructure, we map the strategy behind the Microsoft deal. • community impact in Childress and local hiring • 750 MW campus scale with 500 MW operating • grid-connected power and 345 kV lines • substation readiness and long-lead equipment • air-cooled Bitcoin hall...
NOW PLAYING
IREN - Childress Facility Tour & Analysis!
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.