EPISODE · Aug 10, 2026 · 1 MIN
Iron Springs Road Passing Lane Project Begins in Yavapai County
from SignalsAZ.com - Arizona News Podcast
Send us a text and chime in!Please be advised that the Arizona Department of Transportation, in conjunction with Asphalt Paving & Supply, Inc., will be constructing two passing lanes on Iron Springs Road on behalf of Yavapai County. One passing lane being at the intersection of Skyline Drive between mileposts 4.9 and 5.6 and another north of Tonto Road between mileposts 12.4 and 13.1. The working hours are from 6:00 AM to 5:00 PM, Monday through Friday. During this period, there will be shoulder, lane, and sidewalk closures, along with detours and speed reductions. Two-way traffic on Iron Springs Road will be maintained throughout the project.... For the written story, read here >> https://www.signalsaz.com/articles/iron-springs-road-passing-lane-project-begins-in-yavapai-county/ Check out the CAST11.com Website at: https://CAST11.com Follow the CAST11 Podcast Network on Facebook at: https://Facebook.com/CAST11AZFollow Cast11 Instagram at: https://www.instagram.com/cast11_podcast_network
Embed this episode
What this episode covers
Send us a text and chime in! Please be advised that the Arizona Department of Transportation, in conjunction with Asphalt Paving & Supply, Inc., will be constructing two passing lanes on Iron Springs Road on behalf of Yavapai County. One passing lane being at the intersection of Skyline Drive between mileposts 4.9 and 5.6 and another north of Tonto Road between mileposts 12.4 and 13.1. The working hours are from 6:00 AM to 5:00 PM, Monday through Friday. During this period, there will be ...
NOW PLAYING
Iron Springs Road Passing Lane Project Begins in Yavapai County
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.