EPISODE · Nov 21, 2016 · 11 MIN
Is the Work Model for Wireless Changing? Part 2 of 3.
This is part 2 of a 3-part series. For the contractor, flat pricing causes change order issues. If there are problems at the site, then the contractor must ask for a change order. If the GC who hired them does not want to pay, then the contractor risks not getting paid if the job is … Continue reading Is the Work Model for Wireless Changing? Part 2 of 3. →
Embed this episode
Ready to play
Is the Work Model for Wireless Changing? Part 2 of 3.
0:00
11:19
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Wade4Wireless BlogCast?
This episode is 11 minutes long.
When was this Wade4Wireless BlogCast episode published?
This episode was published on November 21, 2016.
Can I download this Wade4Wireless BlogCast episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!