Skip to content
James Coventry: Site manager at AGL's Liddell Power Station episode artwork

Dec 4, 2024 42 min

James Coventry: Site manager at AGL's Liddell Power Station

from Engineering Success | A NTP Podcast

In this episode of the NTP's Engineering Success podcast, we sit down with James Coventry, the site manager at AGL's Liddell Power Station. James shares his journey from a boilermaker to his current role overseeing the closure and demolition of one of Australia's largest coal-fired power stations. He discusses the challenges and opportunities in transitioning the energy industry, the importance of recycling and environmental responsibility, and AGL's commitment to renewable energy. James provides insights into the complex process of decommissioning a power station, the skills required for the future energy sector, and the exciting developments in the Hunter region. He also touches on his personal experiences moving to Australia and his passion for exploring the country. This conversation offers a fascinating look at the changing landscape of the energy industry and the role of innovation in shaping a sustainable future.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

James Coventry: Site manager at AGL's Liddell Power Station

0:00 42:07

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Engineering Success | A NTP Podcast?

This episode is 42 minutes long.

When was this Engineering Success | A NTP Podcast episode published?

This episode was published on December 4, 2024.

Can I download this Engineering Success | A NTP Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.