EPISODE · Jul 29, 2026 · 1 MIN
JEA Rises Above River with New Power Lines | Jacksonville News
from Jacksonville News Today | 2 Min News | The Daily News Now!
JEA’s massive riverline upgrade is in full swing, with helicopters hoisting crews to 375-foot towers to install new high-voltage lines across the St. Johns River—clearing the way for giant cargo ships bound for Blount Island. Precision is critical over the 2,000-foot span, and with six new lines going up, power will be live by year’s end before the old towers come down. This engineering marvel promises safer navigation and stronger grid reliability, showcasing the grit and scale of modern infrastructure. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/0e039f83260ffa01
Embed this episode
Ready to play
JEA Rises Above River with New Power Lines | Jacksonville News
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.