José Luis Oviedo - Responsable EPE Reconquista episode artwork

EPISODE · Aug 28, 2012 · 4 MIN

José Luis Oviedo - Responsable EPE Reconquista

from VeraNoticias

Ayer a las 19.30, se cortó un cable conductor de la línea de 33 kv, que une Calchaquí – Margarita, a la altura del km 213, lo cual dejó sin energía a nuestra ciudad por el espacio de 5 horas.

Episode metadata supplied by the publisher feed · Published Aug 28, 2012

Embed this episode

NOW PLAYING

José Luis Oviedo - Responsable EPE Reconquista

0:00 4:51

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of VeraNoticias?

This episode is 4 minutes long.

When was this VeraNoticias episode published?

This episode was published on August 28, 2012.

Can I download this VeraNoticias episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!