JoyAudioCut | Energy sector
from Audio Cut Hosted by JoyFM
The unreliable supply of power in the country has again reingnited the debate for private participation in the energy sector. The Asantehene Otumfuo Osei Tutu II at the commissioning of the Genser Gas project in Kumasi raised the issue.
Embed this episode
No transcript yet.
Similar podcasts
Frequently asked questions
How long is this episode of Audio Cut?
This episode is 4 minutes long.
When was this Audio Cut episode published?
This episode was published on April 19, 2024.
Can I download this Audio Cut episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.