Kansas City Pedestrian Bridge Breaks Ground | Kansas City News episode artwork

EPISODE · Sep 9, 2026 · 1 MIN

Kansas City Pedestrian Bridge Breaks Ground | Kansas City News

from Kansas City News Today | 2 Min News | The Daily News Now!

Kansas City is finally building its long-awaited pedestrian bridge over Brush Creek, set to break ground this Wednesday at 2 PM near MLK Park. Mayor Lucas and Congressman Cleaver will be there, with Cleaver securing $2.8 million in federal funding to make it happen. Designed to be 220 feet long, 14 feet wide, and 32 feet tall, the sleek arch bridge will feature LED lighting and dramatically improve safety and access—especially for kids—to the park’s playground, turning a once-hassle-filled crossing into a seamless, scenic connection. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/c22d4eb89ff6fe6d

Episode metadata supplied by the publisher feed · Published Sep 9, 2026

Embed this episode

Ready to play

Kansas City Pedestrian Bridge Breaks Ground | Kansas City News

0:00 1:14

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Kansas City News Today | 2 Min News | The Daily News Now!?

This episode is 1 minute long.

When was this Kansas City News Today | 2 Min News | The Daily News Now! episode published?

This episode was published on September 9, 2026.

Can I download this Kansas City News Today | 2 Min News | The Daily News Now! episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!