Keel Infrastructure - CEO, Ben Gagnon Q&A - $458M Convert Update! episode artwork

EPISODE · Jun 10, 2026 · 26 MIN

Keel Infrastructure - CEO, Ben Gagnon Q&A - $458M Convert Update!

from Power Analysis · host Anthony Power & Bryce McNallie

We sit down with Ben Gagnon, CEO of Keel Infrastructure, right after the company’s $458M convertible raise to unpack why the timing matters and how the capital supports permitting, leasing and locking in expansion megawatts. We also press on deal confidence, disclosure timing, and why “not all megawatts are created equally” as AI demand pushes buyers from 2027 power toward 2028. • rationale for the convertible raise and why management calls it opportunistic and strategic • how Keel thinks about runway, liquidity and funding expansion capacity beyond the headline sites • what a near-billion-dollar balance sheet signals to potential tenants and partners • how the capped call works conceptually and why flexibility matters with convertibles • why management says it is “more confident” on three deals by year-end while staying inside NDAs • the plan to announce signed deals quickly rather than waiting for earnings timing • pros and cons of preleasing far out versus contracting closer to delivery • how token-based AI usage could change who pays premiums and how lease economics evolve • labour and construction context, with Pennsylvania positioned differently from overheated markets Let us know in the comment section below what you thought about this big announcement from Kiel and if you're currently holding shares!Anthonys Info:Website:https://www.powermininganalysis.comX: https://twitter.com/cazenove_ukPatreon:https://www.patreon.com/Cazenove_UKBryce's Info:X:https://twitter.com/McnallieMPatreon:https://www.patreon.com/McNallieMoneyMerch:https://shop.mcnalliemoney.com/Website:https://www.mcnalliemoney.comBusiness Inquiries:Email - [email protected]

Episode metadata supplied by the publisher feed · Published Jun 10, 2026

Embed this episode

We sit down with Ben Gagnon, CEO of Keel Infrastructure, right after the company’s $458M convertible raise to unpack why the timing matters and how the capital supports permitting, leasing and locking in expansion megawatts. We also press on deal confidence, disclosure timing, and why “not all megawatts are created equally” as AI demand pushes buyers from 2027 power toward 2028. • rationale for the convertible raise and why management calls it opportunistic and strategic • how Kee...

Distinct summary based on available episode metadata or transcript content.

NOW PLAYING

Keel Infrastructure - CEO, Ben Gagnon Q&A - $458M Convert Update!

0:00 26:21

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Power Analysis?

This episode is 26 minutes long.

When was this Power Analysis episode published?

This episode was published on June 10, 2026.

Can I download this Power Analysis episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!